SAFETY
| Owens Corning Asphalt Team Gets Recognized By Earning OSHA VPP Star Certification | |
![]() |
Owens Corning Linnton Asphalt facility was accepted into the Voluntary Protection Program (VPP) |
| Aerial Lift Training for Rail Unloading Crews | |
![]() ![]() |
Accessing the top of tanker cars can be dangerous. Climbing the ladder with no fall protection, having guard rails lower than the OSHA standards due to clearance issues within the rail system, and having to work on top of the railcar with hand tools to open the hatch. I performed a safety study to look at all areas of the rail unloading operation. The obvious issue was no fall protection. With most injuries within the US caused from falls, we must act now. Through the study, we found many vendors that would offer complete catwalk systems with railings and bridges, but these were big capitol investments. We needed a cost effective solution for the pain we were experiencing. Though the design safety review process we would purchase an aerial lift with an installed an OSHA approved swing gate. We would then use retractable fall arrest equipment to access the top of the railcar, without compromising the safety of the facilities employees. Not only was this a fall protection issue removed, but we also ordered an onboard generator for the aerial lift to provide power tools at the top of the railcar, thus eliminating repetitive motion and stress injuries caused by using hand tools. |
| Custom Machine Guarding Set a Standard with OR-OSHA | |
![]() |
The pain: material pumps that were being purchased did not have approved guarding. Once approved guarding was applied to the pump, maintenance areas on the pump were not accessible. Finding a practical solution to this issue was needed immediately. In order for any maintenance to be completed on the pump including greasing it the pump would have to be shut down and locked out. This put undo stress on the operators and rushed the maintenance personnel creating even more risk. After assessing all pumps in the facility, we found that we could design parts that attached to the pump and yet allowed for the complete PM process without shutdown. Customer demand was met by implementing a solution to their needs while keeping their customers happy. Employee moral was improved by giving them the tools they needed to feel valuable and efficient. |